New Materials

PIONEERING USE OF HIGH-RESISTANCE CONCRETE IN SPAIN

Detailed design and works site management of the pedestrian walkways giving access to the Olympic enclosure of Montjuïc (Barcelona), using concrete with 80 Mpa resistance. Articles and papers presented at international conferences and congresses.
Barcelona 1991-1992
MUNICIPAL URBAN DEVELOPMENT INSTITUTE (IMPU) 

PIONEERING USE OF STEEL FIBRE CONCRETE AND TECHNIQUES OF BRIDGES WITH POST-TENSIONED PREFABRICATED PANELS IN THE CONSTRUCTION OF A SCULPTURE

Detailed design and works site management of the 14-m-high Sculpture by Roy Lichtenstein at Moll de la Fusta (Barcelona), applying the technology used to build post-tensioned bridges with prefabricated sections.
Barcelona 1991-1992
MUNICIPAL URBAN DEVELOPMENT INSTITUTE (IMPU) 

Copyright © 2010 Esteyco
Castellano · English